Prefab Review

View Original

Kubed Living Prices and Cost

Our price and cost estimates for a prefab home from Kubed Living range from $350 - $500+ per square foot. These estimates are all inclusive, meaning that the cost of the finished containers, labor, and site work are included. Typically, finished container homes from Kubed Living cost between $220 - $250 per square foot, not including components such as engineering, permitting, and site work. When factored into the final cost of the container home, plus any desired upgrades, these components bring the total project cost to around $350+ per square foot. Because Kubed Living specializes in custom projects, there is also a greater chance for price fluctuations as individual choices will affect the final project cost. Below, you can find a table of our cost estimates for a finished house from Kubed Living.

Model Bedrooms Bathrooms Square Feet All-in Cost Estimate (not including land) Container Home Base Cost
K240 Studio 1 240 $84,000 $110,000+
K288 Studio 1 288 $100,800 $118,000+
K320 1 1 320 $112,000 $123,000+
K480 2 1 480 $168,000 $174,000+
K640 2 2 640 $224,000 $195,000+
K800 Flex 2 2 800 $280,000 $242,000+
K960 3 2 960 $336,000 $284,000+
See this form in the original post